title: "Preparing for Healthcare Equipment Delivery: Practical Tips"
description: CME Corp. shares practical tips to prepare healthcare facilities for equipment delivery, installation, staging, IT, and site readiness.
image: https://blog.cmecorp.com/hubfs/ChatGPT%20Image%20Sep%2029%2c%202026%2c%2007_57_12%20AM.png
---

<https://www.cmecorp.com/seca-onsbxintnn-xline-stretcher-scale.html>

- Welcome!
- [Sign In](https://www.cmecorp.com/customer/account/login/referer/aHR0cHM6Ly93d3cuY21lY29ycC5jb20v/)
- or
- [Create an Account](https://www.cmecorp.com/customer/account/create/)
- [![](https://www.cmecorp.com/media/public/icons8-phone-50.png) 800.338.2372](tel:8003382372)

[![CME Corp](https://blog.cmecorp.com/hs-fs/hubfs/CME_CORP_LOGO_FIN_2018_PMS_300dpi-1.png?width=1331&height=442&name=CME_CORP_LOGO_FIN_2018_PMS_300dpi-1.png "CME Corp")](http://www.cmecorp.com)

[Find My Account Manager](https://www.cmecorp.com/about/contact-us.html) | [Contact Us](https://www.cmecorp.com/about/contact-us.html)

Search:

![](https://blog.cmecorp.com/hubfs/_images/search-icon.jpg)

[![](https://blog.cmecorp.com/hs-fs/hubfs/_images/mini-cart.jpg?width=23&height=21&name=mini-cart.jpg)](http://www.cmecorp.com/checkout/cart/)

- [CME Expertise](https://www.cmecorp.com/cme-expertise.html) 
    - [Hospitals / IDNs](https://www.cmecorp.com/cme-expertise/hospitals.html)
    - [Laboratory](https://www.cmecorp.com/cme-expertise/laboratory.html)
    - [Imaging](https://www.cmecorp.com/cme-expertise/imaging.html)
    - [Surgery Centers](https://www.cmecorp.com/cme-expertise/surgery-centers.html)
    - [Clinics](https://www.cmecorp.com/cme-expertise/clinics.html)
    - [Physician Offices](https://www.cmecorp.com/cme-expertise/physician-offices.html)
    - [Behavioral Health Facilities](https://www.cmecorp.com/cme-expertise/behavioral-health.html)
    - [Long Term Care](https://www.cmecorp.com/cme-expertise/long-term-care.html)
    - [Rehabilitation Centers](https://www.cmecorp.com/cme-expertise/rehabilitation.html)
    - [Government Services](https://www.cmecorp.com/cme-expertise/government.html)
    - [Emergency Medical Services](https://www.cmecorp.com/cme-expertise/emergency-medical-services.html)
- [Integrated Services](https://www.cmecorp.com/integrated-services.html) 
    - [CAD-Based Layout & Design](https://www.cmecorp.com/integrated-services/cad-based-layout-and-design.html)
    - [Project Management](https://www.cmecorp.com/integrated-services/project-management.html)
    - [Direct-to-Site Services](https://www.cmecorp.com/integrated-services/direct-to-site-services.html)
    - [Biomedical Services & Technical Solutions](https://www.cmecorp.com/integrated-services/biomedical-services.html)
    - [Contractor Specialties](https://www.cmecorp.com/integrated-services/contractor-specialties.html)
- [Find Products](https://www.cmecorp.com/shop.html) 
    - [Shop By Category](https://www.cmecorp.com/new-shop/shop-by-category.html)
    - [Shop By Manufacturer](https://www.cmecorp.com/new-shop/brands.html)
    - [Digital Solutions Guide](https://cmesolutionsguide.com/)

# Preparing for Healthcare Equipment Delivery: Practical Tips

[![](https://blog.cmecorp.com/hubfs/ChatGPT%20Image%20Sep%2029%2c%202026%2c%2007_57_12%20AM.png)](https://blog.cmecorp.com/preparing-for-healthcare-equipment-delivery-practical-tips)

By [CME Corp Staff](https://blog.cmecorp.com/author/cme-corp-staff) | September 30, 2026

- [Tweet](https://twitter.com/share)

 

Ordering healthcare equipment can feel like a big milestone. The purchase order is approved, the manufacturer confirms the order, and the delivery date is on the calendar.

Then reality arrives, sometimes on a truck (or two).

To prepare for that reality healthcare facilities need to confirm that the building, utilities, technology, clinical teams, delivery route, installation area, and internal processes are ready to receive an equipment delivery.

A missed detail can turn ordinary delivery and installation into an expensive scheduling problem.

Consider these scenarios:

- The CT scanner fits in the imaging room, but not through the doorway leading to it.
- The exam tables arrive before construction is finished, leaving operations to find temporary storage.
- Patient monitors are physically installed, but IT has not approved them for the network.
- A large shipment appears at the loading dock while another project already has the dock reserved.

None of these problems are particularly exotic. Most are coordination problems that can be avoided.

The best defense is a disciplined pre-arrival process that begins well before someone announces, “The truck is here.”

While the guidance below is drawn from current CDC, FDA, OSHA, and Joint Commission materials, facility teams should still verify requirements against their own policies, accreditation obligations, manufacturer instructions, applicable codes, and the specific equipment involved.

Let’s get started.

 

## Start With a Site-Readiness Review

Once facility-specific requirements are understood, the next step is making sure the physical space is ready.

Equipment specifications should be reviewed against the actual installation environment before the delivery date is finalized.

That means going beyond room dimensions.

Facilities, clinical engineering, clinical users, IT, procurement, project management, infection prevention, and the equipment distributor may all have information that affects readiness. The exact group depends on the equipment.

Begin by confirming:

- Equipment dimensions and weight
- Required operating clearances
- Door, hallway, elevator, and loading dock dimensions
- Floor loading requirements
- Electrical specifications
- Emergency power requirements, when applicable
- Medical gas connections
- Plumbing, drainage, or water requirements
- Ventilation requirements
- Data and network connections
- Mounting or structural requirements
- Manufacturer installation requirements
- Environmental conditions such as temperature or humidity
- Space needed for service access

Do not assume the architectural drawing answers every question.

Walk the route.

A floor plan may show a 48-inch doorway, but it will not necessarily show the wall-mounted hand sanitizer dispenser, crash cart alcove, temporary construction barrier, or supply cabinet that has quietly reduced the usable clearance.

Physical verification catches problems that documents cannot.

 

## Map the Entire Delivery Route

The destination room is only the final ten feet of the journey.

Equipment first has to get from the truck to the service location.

**Map the route beginning at the delivery entrance and follow it all the way to the installation location. Measure tight turns, elevators, ramps, door openings, ceiling clearances, and other potential restrictions.**

Large equipment may require:

- Dock access reservations
- Freight elevator scheduling
- Removal of doors or frames
- Temporary removal of ceiling tiles or fixtures
- Floor protection
- Wall protection
- Rigging equipment
- Security escorts
- Traffic control
- After-hours delivery
- Temporary closure of corridors
- Coordination with facilities or construction teams

Weight matters too. Confirm that docks, elevators, floors, ramps, and other surfaces along the route can accommodate the equipment and the equipment used to move it.

Do not forget the packaging.

A device may fit through a doorway after it has been unpacked while the shipping crate does not. Determine where uncrating will occur, who is authorized to do it, and how packing materials will be removed.

There is no glory in discovering at 6:15 a.m. that the crate is four inches wider than the service elevator.

 

## Confirm the Room Is Ready to Receive Equipment

A room being “basically ready” is not the same as being installation-ready.

**Before equipment arrives, verify that work affecting the installation has been completed.** Depending on the project, that can include moving existing healthcare equipment, flooring, millwork, electrical work, plumbing, data cabling, wall reinforcement, painting, ceiling work, medical gas connections, lighting, HVAC work, and final cleaning.

Create a room-readiness signoff rather than relying on verbal confirmation.

The signoff should identify who has verified each requirement and when.

This becomes particularly important when patient care, construction, and equipment schedules overlap. Installing expensive equipment around a patient is not advisable, and an unfinished area can expose the equipment to dust, debris, moisture, physical damage, and repeated movement.

Some installation work may also trigger infection prevention requirements.

CDC guidance recommends an infection-control risk assessment before construction, renovation, repairs, or similar activities that may generate dust or water aerosols. Healthcare facilities should consider adjacent patient-care areas as well as the immediate work zone when evaluating those risks.

If equipment installation requires drilling, opening ceilings, modifying walls, running new conduit, disturbing plumbing, or performing other construction-like work, involve infection prevention early enough to determine whether containment or additional precautions are necessary.

 

## Verify Utilities Before Installation Day

Equipment cannot run on optimism.

Use the manufacturer's site-planning documentation to verify every utility requirement before delivery.

Electrical requirements deserve particular attention. Confirm voltage, amperage, receptacle configuration, circuit requirements, grounding, panel capacity, and whether the equipment needs emergency power.

Label circuits and utility controls clearly. Joint Commission Environment of Care resources specifically address the management of utility systems and the importance of utility design, installation, and shutdown identification.

Equipment involving water, drainage, medical gases, compressed air, vacuum, ventilation, or other building systems requires the same discipline.

Do not wait until the installer arrives to discover that the outlet is the wrong configuration or a required connection terminates three feet from where the equipment actually sits.

**One simple practice can prevent a surprising amount of trouble: schedule a facilities walk-through using the manufacturer's installation drawings and physically point to every required connection.**

 

## Bring IT in Before the Device Shows Up

These days healthcare equipment is connected equipment.

Patient monitors, imaging systems, medication management technology, diagnostic devices, smart beds, laboratory equipment, and many other systems may communicate with hospital networks, other devices, clinical applications, or cloud-based platforms.

**Physical installation does not mean the equipment is ready for clinical operation.**

IT and cybersecurity teams may need to review:

- Network architecture
- Wired or wireless connectivity
- IP address requirements
- Firewall rules
- VLAN placement
- User authentication
- Software versions
- Data flows
- Interfaces
- Remote-access requirements
- Vendor access
- Patch management
- Cybersecurity documentation
- Integration with the EHR or other clinical systems

FDA notes that connected medical devices can introduce cybersecurity risks and that manufacturers, healthcare facilities, and other stakeholders share responsibility for managing those risks.

**Practical Tip**: Get those conversations moving during delivery planning, not while a field engineer is standing next to an unpacked device waiting for network access.

Consider a new group of bedside monitors. Facilities may have the power and mounting infrastructure ready, clinical engineering may have completed its planning, and nursing may be prepared for training. The project can still stall because network security requirements were never submitted.

The equipment is technically installed.

Operationally, it is furniture.

 

## Plan Receiving, Staging, and Storage

Not every shipment goes directly from the truck into its permanent location.

Determine what happens immediately after delivery.

- Who accepts the shipment?
- Where will it be staged?
- Who compares the shipment against the purchase order?
- Who documents damage?
- Where are accessories stored?
- How quickly must packaging be removed?

![CME\_CORP\_LOGO\_400x400](https://blog.cmecorp.com/hs-fs/hubfs/CME_CORP_LOGO_400x400.png?width=26&height=25&name=CME_CORP_LOGO_400x400.png)[Explore CME Corp’s warehousing, assembly, and staging services](https://www.cmecorp.com/integrated-services/direct-to-site-services.html).

Healthcare facilities receiving equipment for multiple rooms should develop a staging plan before delivery.

Label destinations clearly by building, floor, department, room, or project phase. When practical, coordinate shipment sequencing so products arrive in an order that matches installation needs.

A room-by-room equipment schedule can be extremely helpful. Include the item description, quantity, manufacturer, destination, expected delivery date, installation responsibility, dependencies, and status.

This is especially useful during renovations, new construction, department expansions, and large equipment refreshes.

Without a staging plan, receiving areas can become accidental warehouses.

That rarely makes anyone at the loading dock happier.

 

## Decide Who Owns Installation

“Installation included” can mean different things depending on the equipment and contract.

**Clarify installation responsibilities before delivery.**

Determine whether installation will be completed by:

- The manufacturer
- A manufacturer's authorized installer
- The distributor
- A third-party contractor
- Facility personnel
- A combination of several teams

Document what installation includes.

Does the installer assemble the equipment? Anchor it? Connect utilities? Configure software? Remove packaging? Perform testing? Coordinate calibration? Mount accessories? Clean the work area?

Also identify work that is specifically excluded.

A clean responsibility matrix prevents the familiar installation-day conversation:

“We thought your team was doing that.”

“No, we thought your team was doing that.”

Neither team wants to have that conversation while a clinical department is waiting to open.

 

## Protect Patient Care During Delivery and Installation

Healthcare facilities rarely have the luxury of stopping operations because equipment is arriving.

Plan how the delivery affects patients, clinicians, visitors, and nearby departments.

Large deliveries can block corridors, increase noise, affect elevator availability, interfere with patient transport, or create temporary hazards.

**Determine whether delivery should occur during lower-volume hours. Coordinate with security, environmental services, facilities, nursing leadership, procedural areas, and other affected departments.**

Installation work that produces dust or disturbs building systems deserves particular attention. CDC guidance recommends multidisciplinary planning and appropriate infection-control measures for healthcare construction, renovation, maintenance, and repair activities.

The objective is not simply getting equipment into the building. It is getting equipment into the building without unnecessarily disrupting patient care.

 

## Prepare Clinical Engineering and Acceptance Processes

Delivery is not permission to begin using medical equipment.

**Healthcare organizations should have a defined process for equipment inspection, testing, documentation, and release into service**.

<https://www.cmecorp.com/integrated-services/biomedical-services.html>![CME\_CORP\_LOGO\_400x400](https://blog.cmecorp.com/hs-fs/hubfs/CME_CORP_LOGO_400x400.png?width=26&height=25&name=CME_CORP_LOGO_400x400.png)[Explore CME Corp’s incoming equipment inspection services](https://www.cmecorp.com/integrated-services/biomedical-services.html).

Joint Commission guidance states that medical equipment should undergo appropriate electrical safety and operational or functional checks before initial use, according to applicable requirements and manufacturer instructions.

Clinical engineering or biomedical engineering teams may need advance access to:

- Manufacturer and model information
- Serial numbers
- Service manuals
- Instructions for use
- Preventive maintenance recommendations
- Warranty information
- Software information
- Accessories
- Electrical safety specifications
- Service contacts

Asset tags, maintenance schedules, computerized maintenance management system records, and warranty dates may also need to be established before equipment becomes part of routine operations. CME’s biomedical and technical services team can supplement your existing biomedical staff by assisting with tasks such as incoming inspections, asset tagging, calibration, preventive maintenance, and related equipment documentation.

<https://www.cmecorp.com/integrated-services/biomedical-services.html>![CME\_CORP\_LOGO\_400x400](https://blog.cmecorp.com/hs-fs/hubfs/CME_CORP_LOGO_400x400.png?width=26&height=25&name=CME_CORP_LOGO_400x400.png)[Explore CME Corp’s asset tagging services](https://www.cmecorp.com/integrated-services/biomedical-services.html).

Build this work into the schedule.

Do not treat inspection and acceptance as an administrative step squeezed between delivery and the first patient.

 

## Plan the First Days After Installation

Equipment implementation does not end when the installer leaves.

Create a short post-installation plan.

Confirm who staff should contact for equipment questions, technical problems, missing accessories, workflow concerns, or warranty issues. Monitor whether equipment is being stored, charged, cleaned, and used as planned.

Frontline feedback can quickly reveal problems.

OSHA's hospital guidance on safe patient handling equipment, for example, emphasizes involving frontline staff when selecting equipment and making sure equipment is accessible, maintained, and ready when employees need it.

That principle applies well beyond patient lifts.

Equipment has to work within the daily reality of the department.

A technically successful installation can still create operational headaches if cables are difficult to manage, storage is inconvenient, charging locations are inadequate, accessories disappear, or staff cannot easily move the equipment between rooms.

Capture those lessons and use them in the next equipment project.

 

## Use a Pre-Arrival Checklist With Clear Ownership

The most effective readiness process is repeatable.

**Create a standard checklist that can be adjusted by equipment type.** Assign each item to a specific person or department and establish a completion deadline.

A practical checklist might cover five categories:

- **Site:** Room complete, measurements confirmed, delivery route verified, staging area identified.
- **Infrastructure:** Power, utilities, HVAC, mounting, structural needs, network connections, and data requirements confirmed.
- **Operations:** Delivery scheduled, dock reserved, elevators coordinated, security informed, installation responsibilities documented.
- **Safety and compliance:** Infection prevention review completed when applicable, equipment acceptance process scheduled, required documentation available.
- **People:** Clinical users informed, training scheduled, departmental workflow reviewed, escalation contacts identified.

Require unresolved items to be discussed before the delivery date rather than accepted with a hopeful “we'll figure it out.”

Sometimes the smartest equipment decision is delaying delivery until the site is truly ready.

 

## ![direct to site project management](https://blog.cmecorp.com/hs-fs/hubfs/direct%20to%20site%20project%20management.png?width=352&height=310&name=direct%20to%20site%20project%20management.png)Partner with CME Corp for Warehousing, Assembly, Staging, Direct-to-Site Delivery, and Equipment Check-In

CME’s [direct-to-site project managers](https://www.cmecorp.com/integrated-services/project-management.html) work with healthcare organizations and our in-house teams to coordinate delivery of capital healthcare or laboratory equipment and furnishings. Our teams of employee-owners support equipment acquisition from quote to direct-to-site delivery scheduled around your need-by-date.

<https://www.cmecorp.com/about/find-my-account-manager.html>![CME\_CORP\_LOGO\_400x400](https://blog.cmecorp.com/hs-fs/hubfs/CME_CORP_LOGO_400x400.png?width=26&height=25&name=CME_CORP_LOGO_400x400.png)[Connect with your account manager](https://www.cmecorp.com/about/find-my-account-manager.html)

Because sometimes the most useful piece of healthcare technology is still the person who knows who to call.

 

---

---

**About CME:** CME Corp is the nation’s premier specialty distributor of healthcare, [laboratory,](https://www.cmecorp.com/cme-expertise/laboratory.html) and [imaging equipment](https://www.cmecorp.com/cme-expertise/imaging.html). We partner with over 2,000 manufacturers to offer more than 2 million products. In addition to an extensive product portfolio, we also offer project management, CAD-based layout, design and 3d modeling, warehousing, assembly, staging, consolidated, need-by-date direct-to-site delivery, and [biomedical and technical services](https://www.cmecorp.com/integrated-services/biomedical-services.html), all staffed by CME employees. Our mission, to help healthcare facilities nationwide reduce the cost of the equipment they purchase, make their equipment acquisition, delivery, installation, and maintenance processes more efficient, and help them seamlessly launch, renovate, or expand on schedule, is supported by service locations strategically located across the country. 

[Capital Medical Equipment](https://blog.cmecorp.com/topic/capital-medical-equipment)

![](https://blog.cmecorp.com/hs-fs/hubfs/logo.png?height=100&name=logo.png)

Written by   
[CME Corp Staff](https://blog.cmecorp.com/author/cme-corp-staff)   
 CME Corp's staff explores and presents the latest findings, news, and trends of the healthcare industry.

### Posts by Tag

- [June 2017 (14)](https://blog.cmecorp.com/archive/2017/06)
- [October 2017 (8)](https://blog.cmecorp.com/archive/2017/10)
- [September 2023 (8)](https://blog.cmecorp.com/archive/2023/09)
- [November 2015 (7)](https://blog.cmecorp.com/archive/2015/11)
- [December 2015 (7)](https://blog.cmecorp.com/archive/2015/12)
- [July 2017 (7)](https://blog.cmecorp.com/archive/2017/07)
- [September 2017 (7)](https://blog.cmecorp.com/archive/2017/09)
- [November 2017 (7)](https://blog.cmecorp.com/archive/2017/11)
- [October 2023 (7)](https://blog.cmecorp.com/archive/2023/10)
- [August 2026 (7)](https://blog.cmecorp.com/archive/2026/08)
- [August 2014 (6)](https://blog.cmecorp.com/archive/2014/08)
- [June 2016 (6)](https://blog.cmecorp.com/archive/2016/06)
- [February 2018 (6)](https://blog.cmecorp.com/archive/2018/02)
- [April 2018 (6)](https://blog.cmecorp.com/archive/2018/04)
- [May 2018 (6)](https://blog.cmecorp.com/archive/2018/05)
- [August 2025 (6)](https://blog.cmecorp.com/archive/2025/08)
- [July 2014 (5)](https://blog.cmecorp.com/archive/2014/07)
- [September 2014 (5)](https://blog.cmecorp.com/archive/2014/09)
- [January 2017 (5)](https://blog.cmecorp.com/archive/2017/01)
- [December 2017 (5)](https://blog.cmecorp.com/archive/2017/12)
- [November 2021 (5)](https://blog.cmecorp.com/archive/2021/11)
- [June 2023 (5)](https://blog.cmecorp.com/archive/2023/06)
- [August 2023 (5)](https://blog.cmecorp.com/archive/2023/08)
- [November 2023 (5)](https://blog.cmecorp.com/archive/2023/11)
- [January 2024 (5)](https://blog.cmecorp.com/archive/2024/01)
- [April 2024 (5)](https://blog.cmecorp.com/archive/2024/04)
- [August 2024 (5)](https://blog.cmecorp.com/archive/2024/08)
- [October 2024 (5)](https://blog.cmecorp.com/archive/2024/10)
- [January 2025 (5)](https://blog.cmecorp.com/archive/2025/01)
- [April 2025 (5)](https://blog.cmecorp.com/archive/2025/04)
- [May 2025 (5)](https://blog.cmecorp.com/archive/2025/05)
- [July 2025 (5)](https://blog.cmecorp.com/archive/2025/07)
- [September 2025 (5)](https://blog.cmecorp.com/archive/2025/09)
- [April 2026 (5)](https://blog.cmecorp.com/archive/2026/04)
- [June 2026 (5)](https://blog.cmecorp.com/archive/2026/06)
- [June 2014 (4)](https://blog.cmecorp.com/archive/2014/06)
- [December 2014 (4)](https://blog.cmecorp.com/archive/2014/12)
- [April 2015 (4)](https://blog.cmecorp.com/archive/2015/04)
- [May 2016 (4)](https://blog.cmecorp.com/archive/2016/05)
- [December 2016 (4)](https://blog.cmecorp.com/archive/2016/12)
- [February 2017 (4)](https://blog.cmecorp.com/archive/2017/02)
- [May 2020 (4)](https://blog.cmecorp.com/archive/2020/05)
- [March 2021 (4)](https://blog.cmecorp.com/archive/2021/03)
- [April 2021 (4)](https://blog.cmecorp.com/archive/2021/04)
- [May 2021 (4)](https://blog.cmecorp.com/archive/2021/05)
- [September 2021 (4)](https://blog.cmecorp.com/archive/2021/09)
- [August 2022 (4)](https://blog.cmecorp.com/archive/2022/08)
- [April 2023 (4)](https://blog.cmecorp.com/archive/2023/04)
- [May 2023 (4)](https://blog.cmecorp.com/archive/2023/05)
- [July 2023 (4)](https://blog.cmecorp.com/archive/2023/07)
- [December 2023 (4)](https://blog.cmecorp.com/archive/2023/12)
- [February 2024 (4)](https://blog.cmecorp.com/archive/2024/02)
- [March 2024 (4)](https://blog.cmecorp.com/archive/2024/03)
- [May 2024 (4)](https://blog.cmecorp.com/archive/2024/05)
- [June 2024 (4)](https://blog.cmecorp.com/archive/2024/06)
- [July 2024 (4)](https://blog.cmecorp.com/archive/2024/07)
- [September 2024 (4)](https://blog.cmecorp.com/archive/2024/09)
- [December 2024 (4)](https://blog.cmecorp.com/archive/2024/12)
- [February 2025 (4)](https://blog.cmecorp.com/archive/2025/02)
- [March 2025 (4)](https://blog.cmecorp.com/archive/2025/03)
- [June 2025 (4)](https://blog.cmecorp.com/archive/2025/06)
- [October 2025 (4)](https://blog.cmecorp.com/archive/2025/10)
- [November 2025 (4)](https://blog.cmecorp.com/archive/2025/11)
- [December 2025 (4)](https://blog.cmecorp.com/archive/2025/12)
- [January 2026 (4)](https://blog.cmecorp.com/archive/2026/01)
- [February 2026 (4)](https://blog.cmecorp.com/archive/2026/02)
- [March 2026 (4)](https://blog.cmecorp.com/archive/2026/03)
- [May 2026 (4)](https://blog.cmecorp.com/archive/2026/05)
- [July 2026 (4)](https://blog.cmecorp.com/archive/2026/07)
- [September 2026 (4)](https://blog.cmecorp.com/archive/2026/09)
- [March 2014 (3)](https://blog.cmecorp.com/archive/2014/03)
- [April 2014 (3)](https://blog.cmecorp.com/archive/2014/04)
- [May 2014 (3)](https://blog.cmecorp.com/archive/2014/05)
- [May 2015 (3)](https://blog.cmecorp.com/archive/2015/05)
- [September 2015 (3)](https://blog.cmecorp.com/archive/2015/09)
- [October 2015 (3)](https://blog.cmecorp.com/archive/2015/10)
- [January 2016 (3)](https://blog.cmecorp.com/archive/2016/01)
- [April 2017 (3)](https://blog.cmecorp.com/archive/2017/04)
- [January 2018 (3)](https://blog.cmecorp.com/archive/2018/01)
- [July 2018 (3)](https://blog.cmecorp.com/archive/2018/07)
- [March 2019 (3)](https://blog.cmecorp.com/archive/2019/03)
- [June 2019 (3)](https://blog.cmecorp.com/archive/2019/06)
- [March 2020 (3)](https://blog.cmecorp.com/archive/2020/03)
- [June 2021 (3)](https://blog.cmecorp.com/archive/2021/06)
- [July 2021 (3)](https://blog.cmecorp.com/archive/2021/07)
- [March 2022 (3)](https://blog.cmecorp.com/archive/2022/03)
- [May 2022 (3)](https://blog.cmecorp.com/archive/2022/05)
- [June 2022 (3)](https://blog.cmecorp.com/archive/2022/06)
- [September 2022 (3)](https://blog.cmecorp.com/archive/2022/09)
- [November 2022 (3)](https://blog.cmecorp.com/archive/2022/11)
- [February 2023 (3)](https://blog.cmecorp.com/archive/2023/02)
- [November 2024 (3)](https://blog.cmecorp.com/archive/2024/11)
- [October 2014 (2)](https://blog.cmecorp.com/archive/2014/10)
- [January 2015 (2)](https://blog.cmecorp.com/archive/2015/01)
- [July 2015 (2)](https://blog.cmecorp.com/archive/2015/07)
- [August 2015 (2)](https://blog.cmecorp.com/archive/2015/08)
- [February 2016 (2)](https://blog.cmecorp.com/archive/2016/02)
- [March 2016 (2)](https://blog.cmecorp.com/archive/2016/03)
- [November 2016 (2)](https://blog.cmecorp.com/archive/2016/11)
- [May 2017 (2)](https://blog.cmecorp.com/archive/2017/05)
- [August 2017 (2)](https://blog.cmecorp.com/archive/2017/08)
- [March 2018 (2)](https://blog.cmecorp.com/archive/2018/03)
- [July 2019 (2)](https://blog.cmecorp.com/archive/2019/07)
- [January 2020 (2)](https://blog.cmecorp.com/archive/2020/01)
- [February 2020 (2)](https://blog.cmecorp.com/archive/2020/02)
- [August 2020 (2)](https://blog.cmecorp.com/archive/2020/08)
- [September 2020 (2)](https://blog.cmecorp.com/archive/2020/09)
- [October 2020 (2)](https://blog.cmecorp.com/archive/2020/10)
- [February 2021 (2)](https://blog.cmecorp.com/archive/2021/02)
- [August 2021 (2)](https://blog.cmecorp.com/archive/2021/08)
- [October 2021 (2)](https://blog.cmecorp.com/archive/2021/10)
- [January 2022 (2)](https://blog.cmecorp.com/archive/2022/01)
- [April 2022 (2)](https://blog.cmecorp.com/archive/2022/04)
- [January 2023 (2)](https://blog.cmecorp.com/archive/2023/01)
- [March 2023 (2)](https://blog.cmecorp.com/archive/2023/03)
- [November 2014 (1)](https://blog.cmecorp.com/archive/2014/11)
- [February 2015 (1)](https://blog.cmecorp.com/archive/2015/02)
- [March 2015 (1)](https://blog.cmecorp.com/archive/2015/03)
- [April 2016 (1)](https://blog.cmecorp.com/archive/2016/04)
- [July 2016 (1)](https://blog.cmecorp.com/archive/2016/07)
- [August 2016 (1)](https://blog.cmecorp.com/archive/2016/08)
- [September 2016 (1)](https://blog.cmecorp.com/archive/2016/09)
- [March 2017 (1)](https://blog.cmecorp.com/archive/2017/03)
- [August 2018 (1)](https://blog.cmecorp.com/archive/2018/08)
- [September 2018 (1)](https://blog.cmecorp.com/archive/2018/09)
- [October 2018 (1)](https://blog.cmecorp.com/archive/2018/10)
- [January 2019 (1)](https://blog.cmecorp.com/archive/2019/01)
- [April 2019 (1)](https://blog.cmecorp.com/archive/2019/04)
- [April 2020 (1)](https://blog.cmecorp.com/archive/2020/04)
- [June 2020 (1)](https://blog.cmecorp.com/archive/2020/06)
- [July 2020 (1)](https://blog.cmecorp.com/archive/2020/07)
- [November 2020 (1)](https://blog.cmecorp.com/archive/2020/11)
- [December 2020 (1)](https://blog.cmecorp.com/archive/2020/12)
- [July 2022 (1)](https://blog.cmecorp.com/archive/2022/07)
- [October 2022 (1)](https://blog.cmecorp.com/archive/2022/10)
- [December 2022 (1)](https://blog.cmecorp.com/archive/2022/12)

See all

#### About CME Corp.

- [Our Company](https://www.cmecorp.com/about/our-company.html)
- [Careers](https://www.cmecorp.com/about/careers.html)

#### Resources

- [CME Insider's Blog](https://blog.cmecorp.com/)
- [Case Studies](https://www.cmecorp.com/about/case-studies.html)
- [Newsroom](https://blog.cmecorp.com/press-releases)
- [Literature Resources](https://resources.cmecorp.com/)

#### Quick Links

- [Find Products](https://www.cmecorp.com/shop)
- [Privacy Policy](https://www.cmecorp.com/privacy-policy-cookie-restriction-mode)
- [Sales, Shipping & Return Policies](https://www.cmecorp.com/sales-shipping)
- [Credit Application](https://www.cmecorp.com/about/credit-application.html)

[![](https://www.cmecorp.com/media/public/linked_in_blog.png)](https://www.linkedin.com/company/cme-medical/) [![](https://www.cmecorp.com/media/public/facebook_blog.png)](https://www.facebook.com/cmecorp/) [![](https://www.cmecorp.com/media/public/instagram_blog.png)](https://www.instagram.com/cme_corp/)

© 2026 CME Corp - An ESOP Company  
Delivering a Better Experience